Delivery approaches
How a linear, iterative or hybrid way of delivering products shapes the way a project is planned.
Scene 1
Delivery approaches
How a linear, iterative or hybrid way of delivering products shapes the way a project is planned.
Caption 1 of 3
Describe linear-sequential and iterative-incremental delivery
Read all scene text
- Describe linear-sequential and iterative-incremental delivery
- Recognise when a hybrid approach is useful
- Explain how the delivery approach affects planning
Scenes animate with GSAP. Use pause or replay at any time.
In this session
- Describe linear-sequential and iterative-incremental delivery
- Recognise when a hybrid approach is useful
- Explain how the delivery approach affects planning
It's time to think about how the products will actually be built, because that shapes the plan.
Let's say you're planning two things at once: the York shop and the pre-order app. Sam tries to plan them the same way, with every feature of the app designed up front, then built, then tested at the end.
Does one approach fit both?
Select the arrow to learn more
1 of 4
The shop
You can't fit the counter before the walls are plastered. The building work has to happen in a fixed order, and the design is clear before work starts.
Linear-sequential
In a linear-sequential approach, work moves through steps in order: design, build, test, hand over. Each step finishes before the next starts.
It suits work where the requirements are clear and changes late on are expensive, like building and fitting out a shop.
Iterative-incremental
In an iterative-incremental approach, products are built in small pieces over repeated cycles. Each cycle delivers something usable, and feedback shapes the next one.
It suits work where requirements are uncertain or likely to change, like the pre-order app. Ana's team works in 2-week cycles, often called sprints, with a prioritised list of features.
Hybrid approaches
Many projects mix approaches. A hybrid approach uses linear-sequential for some products and iterative-incremental for others.
If you combined York and the app into one project, the building work would be linear, the app would be iterative, and a single project plan would show how both come together for opening day.
How it affects the plan
The delivery approach changes several planning choices:
- Stage length: iterative work often has stages made up of a set number of cycles
- Detail: linear plans list products in detail up front; iterative plans fix time and cost and let scope flex
- Tolerances: iterative work often has zero tolerance on time and cost, with tolerance on scope instead
- Products: iterative plans describe features at a high level and refine them each cycle
Key points to remember
- The delivery approach describes how products are built.
- Linear-sequential suits clear, fixed requirements; iterative-incremental suits uncertain ones.
- Hybrid approaches mix both within one project.
- The delivery approach shapes stage length, detail and tolerances.
Knowledge check
Choose one answer
Practices
What is a feature of linear-sequential delivery?
Sign in to save your result. Knowledge checks can be retried any time.
PRINCE2® is a registered trademark of the PeopleCert group. MockAcademy is independent and not affiliated with, endorsed by or licensed by PeopleCert.